Getty Drills 68.5m of 0.81% Cu from 39.5m and 184m of 0.37% Cu in First Holes at Getty South
NewsfileSep 2, 2026 · 3 days ago
Drill Intercepts ⛏
6/100.81 % CU · 68.5m
7/100.37 % CU · 184m
6/100.81 % CU · 68.5m
Analyst Takeaways
- Getty South shows encouraging near-surface copper mineralization with 68.5m at 0.81% Cu from 39.5m depth, suggesting potential for open-pit extraction economics.
- The 184m intersection at 0.37% Cu indicates a broader mineralized system that could support larger-scale production if grade continuity is confirmed.
- Copper mineralization extended 72m below historical intercepts and remains open within an IP anomaly, suggesting significant upside potential from continued exploration.
- This is the first significant drill program at Getty South in ~30 years, indicating the company is revitalizing a previously explored asset with modern techniques.
- Pending assays from 14 additional holes (11 at Getty South, 3 at Getty North) could materially expand the resource and de-risk the project trajectory.
AI-generated · verify against original source
Highlights:Getty South delivers near-surface, high-grade copper mineralization, including 68.5m grading 0.81% Cu from 39.5m depth and 184m grading 0.37% CuCopper mineralization extended 72m below historical intercepts and remains open within broader Induced Polarization (IP) geophysical anomalyFirst significant drill program at Getty South in ~30 yearsStep out assays pending for 11 additional holes at Getty South and 3 holes at Getty NorthVancouver, British Columbia--(Newsfile Corp. - September...
Frequently Asked Questions