OREBRIEF · SOURCE REPORT
Q2 Metals Extends Near Surface Mineralization 100 Metres North at the Cisco Lithium Project, Intercepting 134.5 Metres at 1.20% Li₂O and 101.6 Metres at 1.02% Li₂O
Source: Globe Newswire · Reported October 7, 2026
At a glance
Q2 Metals Extends Near-Surface Mineralization 100 Metres North at the Cisco Lithium Project, Intercepting 134.5 Metres at 1.20% Li2O and more.
From the available Globe Newswire headline and excerpt. Company claims have not been independently verified.
Highlighted intercepts
1.20 % LI2O over 134.5mScreening score 9.5/10
1.20 % LI over 134.5mUnscored: metal or reporting basis is ambiguous
1.02 % LI over 101.6mUnscored: metal or reporting basis is ambiguous
Captured from the headline and available excerpt, ordered by screening score. May include overlapping intervals; this is not the complete assay table. Reported interval is not assumed to be true width. Scores exclude recovery, continuity, depth, capex and economics. Read the scoring method.
Read the source
Open the original report at Globe Newswire ↗Why this story is ranked here · 0/100
Editorial priority, not an investment rating. This is the public ranking; personal watchlists can add a small boost in your feed. Methodology →