Auriginal Intersects 45.5 m of 1.05 g/t Au and 29.4 m of 1.32 g/t Au at Roger, Extending Gold-Copper Mineralization at Depth; Updated Mineral Resource Estimate Expected Before Year-End 2026
At a glance
HighlightsAssays from the final three Phase 1 holes (AUR-26-08 to AUR-26-10) and the first Phase 2 hole to be reported (AUR-26-12) returned broad gold-copper mineralization in every hole, beginning near surface and persisting to approximately 660 m down-hole.AUR-26-12: 45.5 m grading 1.05 g/t Au from 397.0 m, including 8.0 m grading 4.37 g/t Au and 2.2 m grading 12.2 g/t Au, 31.9 g/t Ag, 0.35% Cu and 0.21% Zn; plus 23.2 m grading 1.35 g/t Au from 111.0 m (including 1.5 m at 16.3 g/t Au) and 19.5...
From the available Newsfile headline and excerpt. Company claims have not been independently verified.
Highlighted intercepts
More captured intervals (3)
Captured from the headline and available excerpt, ordered by screening score. May include overlapping intervals; this is not the complete assay table. Reported interval is not assumed to be true width. Scores exclude recovery, continuity, depth, capex and economics. Read the scoring method.
Read the source
Open the original report at Newsfile ↗Why this story is ranked here · 42/100
- Reported drill results
- Source excerpt available
- Numerical intercept reported
Editorial priority, not an investment rating. This is the public ranking; personal watchlists can add a small boost in your feed. Methodology →