orebriefCoverage & methodology
← Back to the dashboard
OREBRIEF · SOURCE REPORT

Auro Intersects 572m Grading 0.60 g/t Gold and 0.1% Copper at the Santa Barbara Gold-Copper Project, Ecuador

Source: Newsfile · Reported October 13, 2026 · AURO
WHAT CHANGED. WHAT COUNTS.

At a glance

Auro Metals Inc. (TSXV: AURO) (OTCQB: AURFF) ("Auro" or the "Company"), is pleased to announce the assay results of the final five drill holes from the 2026 Phase I Drill Program at the Santa Barbara Gold-Copper Project (the "Project") located in the Zamora-Chinchipe Province in southeastern Ecuador. This is the sixth batch from Phase I which comprised 22 drillholes (DSB-54 to DSB-75) totaling 11,047 metres ("m").The 20,000m -...

From the available Newsfile headline and excerpt. Company claims have not been independently verified.

REPORTED RESULTS

Highlighted intercepts

0.60 g/t AU over 572mScreening score 9/10

Captured from the headline and available excerpt, ordered by screening score. May include overlapping intervals; this is not the complete assay table. Reported interval is not assumed to be true width. Scores exclude recovery, continuity, depth, capex and economics. Read the scoring method.

Read the source

Open the original report at Newsfile ↗
Why this story is ranked here · 47/100

Editorial priority, not an investment rating. This is the public ranking; personal watchlists can add a small boost in your feed. Methodology →

More from this company

Auro Intersects 905m Grading 0.60 g/t Gold and 0.12% Copper and Commences 20,000 Metre - Phase II Drill Program at the Santa Barbara Gold-Copper Project, Ecuador→