Selkirk Copper Drills 44.7 metres Grading 2.12% Cu, 1.16 g/t Au, and 10.7 g/t Ag (3.0% CuEq) at Minto North as Part of the Ongoing Phase 2 Drill Program
At a glance
Highlights Infill drilling at Minto North continues to delineate higher grades and broader widths within the centre of this priority resource area: 44.7 meters grading 2.12% Cu, 1.16 g/t Au, 10.7 g/t Ag (3.0% CuEq) in drill hole 26SCM237, including two internal high-grade intervals of 5.83% CuEq over 11.1 m as well as 6.45% CuEq over 9.2 m. 2
From the available Newsfile headline and excerpt. Company claims have not been independently verified.
Highlighted intercepts
Captured from the headline and available excerpt, ordered by screening score. May include overlapping intervals; this is not the complete assay table. Reported interval is not assumed to be true width. Scores exclude recovery, continuity, depth, capex and economics. Read the scoring method.
Read the source
Open the original report at Newsfile ↗Why this story is ranked here · 42/100
- Reported drill results
- Source excerpt available
- Numerical intercept reported
Editorial priority, not an investment rating. This is the public ranking; personal watchlists can add a small boost in your feed. Methodology →